Syrinx Conference 2026: Join us for two days of training, networking, and product innovation. • 18–19 Nov 2026 Register Now →
Get a Demo
Pricing
Plant hire software

No More Idle Equipment.
Keep Your Fleet Working.

Point of Rental unifies inventory, inspections, servicing, and dispatch, so nothing sits idle and nothing falls through the cracks.

Get a Demo

Three Ways Plant Hire Loses Money Quietly.

None of these show up as a single bad day. They show up as a slightly worse quarter, over and over, until someone finally asks why.

  • Clock icon representing idle equipmentEquipment sits idle and nobody notices

    Without utilisation data by machine, gear gathers dust in the yard while a customer waits on backorder for the exact same class of equipment.

  • Wrench icon representing inspections and serviceInspections and service fall through the cracks

    A missed inspection means a customer finds the problem on the jobsite, not your counter finding it before the machine ever left the yard.

  • Map pin icon representing dispatch routingDispatch day turns into chaos

    Load weights, drive times, and last-minute changes turn a Friday delivery route into guesswork done on a whiteboard or a spreadsheet.

Your Counter Can't See What Your Yard Already Knows.

A machine fails an inspection out back, but the person quoting it to a customer up front has no way of knowing that yet. So it gets quoted, scheduled, and only caught at the gate, if you're lucky.

Point of Rental puts inventory, inspections, servicing, and dispatch on one source of truth, so every seat sees the same real-time status.

  • Day at a glance

    Deliveries, will-call, services, inspections, and collections for today, or any day, all in one place.

  • Mobile inspections

    Build inspection templates per machine, require manager review, and let a failed checkpoint create a repair order automatically.

Screenshot of a failed 7:40 AM inspection alert for a backhoe, with the counter notified instantly and a repair order created automatically

Every Truck Is One Bad Route Away from a Missed Window.

Managing a dozen deliveries and pickups against load weights, drive times, and a customer who moved their window twice isn't a job for a whiteboard.

Point of Rental builds and schedules delivery, pickup, and service routes that account for load height and weight, then lets you see every truck in real time.

  • Load-aware routing

    Routes respect height and weight constraints instead of assuming every truck can take every load.

  • Real-time truck visibility

    See trucks live and keep historical data, so customers get an accurate arrival window instead of a guess.

Screenshot of a load-aware delivery route showing stops, load weight, height cleared, and zero missed windows

Customers Wait on Hold Just to Pay You.

Checking availability, paying an invoice, or calling a machine off hire shouldn't require catching your counter staff between calls.

Point of Rental puts your catalog, payments, and account access online, so customers can act the moment they decide to.

  • Online catalog and booking

    Availability, rates, and specs stay live on your site, with online quotes importing straight into Point of Rental.

  • Self-service account portal

    Customers see what's on hire, pay invoices, and call items off hire without a phone call to your office.

Screenshot of an online-booked scissor lift hire paid in full with no phone call to the office

You Find Out a Machine Underperformed at Tax Time, Not in Time to Fix It.

ROI, utilisation, and repair costs live in your data all year, but if nobody's looking until year-end, every decision they inform is a year late.

Point of Rental puts real-time dashboards in front of the people who decide whether to keep, fix, or sell an asset, not just the people who close the books.

  • Utilisation by machine

    See which assets earn their keep and which ones are quietly costing you yard space.

  • Lifecycle decisions, backed by data

    Age, ROI, and performance thresholds tell you when to keep, repair, or sell, before a machine decides for you.

Screenshot of a utilisation-by-machine dashboard flagging an excavator running at 38% utilisation

The Driver, the Yard, and the Office Are All Working off Different Information.

A schedule change made at the counter doesn't help anyone if the driver already left and the yard hasn't heard about it.

Point of Rental automates alerts and gives your team instant internal messaging, so a change made anywhere reaches everyone who needs it.

  • Instant internal messaging

    Reach anyone in the company from desktop or mobile, without trading cell numbers.

  • Automated alerts

    Delivery, inspection, and repair-order updates go out automatically instead of by memory.

Screenshot of a telehandler delivery schedule change with automatic notification reaching three teams at once

Every Dot in Your Data Is a Point. Connect Them.

Add the Rental Intelligence Suite and the meter hours, repair costs, and fleet age you already track become direction: an AI-powered analytics layer built to answer the question every plant hire operation asks eventually, which machines are actually earning their keep.

  • AI Insights surface underperforming equipment and rising repair-cost trends before they cost you more.
  • Ask in plain language and get immediate answers, no report building, no dashboard hunting.
  • Telematics-informed ROI blends utilisation and location data so lifecycle decisions account for where and how hard a machine actually works.
  • Confident lifecycle decisions come from knowing when to keep, fix, or sell an asset using ROI, age, and performance thresholds.
Explore the Rental Intelligence Suite
Rental Intelligence Suite dashboard with recommendation quality, OEC distribution, disposition agent summary, and monthly revenue and repair cost trends

Built for Equipment That Has to Be Somewhere.

Plant hire has needs most general hire software treats as an afterthought. Here's how Point of Rental stacks up against the tools most plant hire operations start with.

Capability
Point of Rental
Typical plant software
Deployment options
Cloud or on-premise, your call
Usually cloud-only, limited IT flexibility
Asset & utilisation tracking
Meter readings, service cycles, and utilisation by machine
Basic usage logs with little lifecycle insight
Dispatch & routing
Load-aware routing that accounts for height and weight limits
Manual scheduling with no load constraints
Maintenance & inspections
Preventive maintenance, inspections, and work orders in one system
Maintenance tools bolted on or tracked separately
Telematics & GPS
Connects to AEMP-standard, OEM, and third-party tracking via Hapn
Few or no native telematics integrations
Payments & self-service
Built-in payments, online catalog, and a customer account portal
Manual invoicing or a bolted-on payment tool
AI-powered insight
Rental Intelligence Suite adds AI insights, plain-language queries, and ROI-backed lifecycle recommendations
No AI layer, insight means building the report yourself
Industry experience
40+ years building hire software, refined against nearly every edge case plant hire can throw at it
Newer entrants still finding out what they missed

"We could not run our business efficiently without all of the products that are included in Point of Rental. They combine to create the singular solution for our rental business."

Kyle T. Heavy equipment rental business, verified review
  • 5,000+ hire businesses served
  • 80+ countries supported
  • 40+ years building hire software
  • 98.4% of support calls resolved first call

Questions, Answered.

What deployment options are available for plant hire?

Point of Rental supports both cloud-hosted and on-premise deployment, so you can choose the model that fits your IT infrastructure and security requirements instead of the other way around.

How does Point of Rental keep inspections and maintenance from falling through the cracks?

Inventory, inspections, servicing, and dispatch all live on one platform. Mobile inspection templates catch problems in the field, and a failed checkpoint can automatically create a repair order, so a bad inspection never just sits in someone's notebook.

Can I plan smarter delivery and service routes?

Yes. Point of Rental builds and optimises delivery, pickup, and service routes that account for load height and weight constraints, and gives you real-time visibility into every truck once it's on the road.

Does Point of Rental handle payments and customer self-service?

Yes. Built-in payment processing covers credit, debit, and ACH, and an online catalog with a customer account portal lets clients check availability, pay invoices, and call items off hire without calling your office.

How do I get visibility into machine utilisation and ROI before it's too late?

Centralised dashboards give you real-time utilisation, ROI, and performance data. Add the Rental Intelligence Suite and AI-powered insights surface underperforming equipment and rising repair costs before they've already cost you the quarter.

Can I track my plant in real time?

Yes. Through our partnership with Hapn, you can see the location of any asset from Elite. Hapn's model works with AEMP, OEM, and third-party tracking, so whether a machine has built-in telematics or a bolted-on GPS device, you can find it with one click.

Start Performing.

See how Point of Rental keeps a plant fleet inspected, dispatched, and paid for, with your inventory, your routes, and your questions.

Get a Demo